News
Hirakud Dam gates to open on July 6 for floodwater release, as per Chief Engineer Sushil Kumar Behera. Details on monsoon ...
Practical Engineering on MSN4h
Rebuilding Oroville Dam: Engineering Under PressureThe Oroville Dam spillway crisis pushed engineers to their limits — with heavy rain, unstable slopes, and huge risks if they ...
Following the discovery of sinkholes, along with the potential of flooding onto a pedestrian walkway, work on needed ...
According to the report, 24 accidents and 45 incidents involving dams were reported in Brazil last year, with two fatalities ...
Repairs to Jurala’s crest gates have been halted due to rising inflows, with work postponed until late 2025. Reduced capacity, traffic pressure, equipment failure, and lack of specialised repair ...
A World Bank team visited Haryana to assess the Saraswati River recharge projects, praising the state's irrigation and water ...
The mayor of Manawa, Mike Frazier, says they requested funds in the state budget to help cover costs to build a new dam.
Some results have been hidden because they may be inaccessible to you
Show inaccessible results